Thursday, March 17, 2011

Spring 2011

 Record Snow fall in Feb 2011 for NW AR, 24" at our house in 5-6 hours... the truck was gone!


With help from Dad we managed to get the cab out of the garage and on the frame, the bed off the ground and on the frame as well. Nothing is bolted down yet, I want to be able to still weld and grind on it.



                                                Ugly welds and a lot of grinding and filling in!
What has been done over the winter? Well, it was in my garage a lot and tried to find the best way to weld it back togeather without spending a million bucks. Guess what, so far it is the old fashion way with Oxy/act and steel rods. The 20 gage metal is to thin for any other type of welding I can afford at this time and it will be slow going with all the cutting I did.